CYCLE TIMES AND QUANTITIES
are crucial. The Mobility division sets standards in every respect. In two-shift operation, a new vehicle rolls off the production line every 60 seconds – 1,000 units or more per day. Restricted accessibility – one work step follows another in a minimum cycle in a very confined space.

High-tech for quantity and quality
Time pressure not only characterizes production in the Mobility segment, but also mechanical engineering. Assembly work is often only possible at weekends or during non-production times. Absolute availability is crucial. Partial downtimes must never bring the cycle to a standstill. The assembly line keeps running, traffic flows tirelessly. Automotive, aviation, rail vehicles and other moving industries demand mechanical engineering of superlatives and constantly new, imaginative “know how”.